Learners are required to convert times between 12 and 24 hour clock formats in words and numbers within a chart.
Goal Path: Emploi, Études postsecondaires, Études secondaires, Autonomie
Date Added: 22 Août 2013
Tags:
Calculate the cost of a Group Golf Package and create a schedule of tee times.
Goal Path: Emploi, Études postsecondaires, Études secondaires
Date Added: 17 Juillet 2013
Tags:
Understand how to calculate materials and costs for creating a flower bed.
Goal Path: Emploi, Études postsecondaires, Études secondaires, Autonomie
Date Added: 17 Juillet 2013
Tags:
Calculate total menu items using percentages to get totals and complete charts for planning.
Goal Path: Emploi, Formation en apprentissage, Études postsecondaires, Études secondaires, Autonomie
Date Added: 17 Juillet 2013
Tags:
Understand and calculate linear pipe expansion when installing plumbing pipes.
Goal Path: Emploi, Formation en apprentissage, Études postsecondaires
Date Added: 10 Avril 2014
Tags:
Preparing menus for a childcare agency
Goal Path: Emploi, Études postsecondaires, Études secondaires
Date Added: 17 Juillet 2013
Tags:
Create a restaurant bill. Complete and calculate the restaurant bill for several tables of guests.
Goal Path: Emploi, Études postsecondaires
Date Added: 17 Juillet 2013
Tags:
Learners are required to complete a multiple choice test. This type of test is often used in GED, ACE, and credit courses.
Goal Path: Emploi, Formation en apprentissage, Études postsecondaires, Études secondaires
Date Added: 3 Mars 2013
In this task set, a learner is asked to complete an academic math test involving measurement and conversion (imperial to metric) as preparation for secondary school math credit course.
Goal Path: Emploi, Formation en apprentissage, Études postsecondaires, Études secondaires
Date Added: 10 Mars 2013
Administrative Clerks in colleges complete and process forms when they collect fees from students.
Goal Path: Emploi, Études postsecondaires
Date Added: 11 Mars 2013